RETAIL SUPPLY TARIFF EFFECTIVE FROM 1st APRIL, 2010

Sl. No.

Category of Consumers

Voltage of Supply 

Demand Charge (Rs./KW/ Month)/ (Rs./KVA/ Month)        

Energy Charge  (P/kWh)

Customer Service Charge (Rs./Month)

Monthly Minimum Fixed Charge for first KW or part (Rs.)

Monthly Fixed Charge for any additional KW or part (Rs.)

Rebate               (P/kWh)/ DPS               

 

LT Category

1

Domestic

 

 

 

 

 

 

 

1.a

Kutir Jyoti  < 30U/month

LT

FIXED MONTHLY CHARGE ---->

30

 

 

1.b

Others

 

 

 

 

 

 

10

 

 (Consumption <= 100 units/month)

LT

 

220.00

 

20

15

 

 

 (Consumption >100, <=200 units/month)

LT

 

390.00

 

20

15

 

 

 (Consumption >200 units/month)

LT

 

490.00

 

20

15

 

 

(Consumption >400 units/month)

LT

 

530.00

 

20

15

 

2

General Purpose < 110 KVA

 

 

 

 

 

 

10

 

 (Consumption <=100 units/month)

LT

 

500.00

 

30

25

 

 

 (Consumption >100, <=300 units/month)

LT

 

610.00

 

30

25

 

 

 (Consumption >300 units/month)

LT

 

680.00

 

30

25

 

3

Irrigation Pumping and Agriculture

LT

 

110.00

 

20

10

10

4

Allied Agriculture Activities

LT

 

120.00

 

20

10

10

5

Allied Agro Industrial Actiivities

LT

 

380.00

 

80

50

DPS/Rebate

6

Public Lighting

LT

 

530.00

 

20

15

DPS/Rebate

7

L.T. Industrial (S) Supply

LT

 

530.00

 

80

35

10

8

L.T. Industrial (M) Supply

LT

 

530.00

 

100

50

DPS/Rebate

9

Specified Public Purpose

LT

 

530.00

 

50

50

DPS/Rebate

10

Public Water Works and Swerage Pumping<110 KVA

LT

 

530.00

 

50

50

10

11

Public Water Works and Swerage Pumping >=110 KVA

LT

200

530.00

30

 

 

10

12

General Purpose >= 110 KVA

LT

200

530.00

30

 

 

DPS/Rebate

13

Large Industry

LT

200

530.00

30

 

 

DPS/Rebate

 

HT Category

14

Bulk Supply - Domestic

HT

15

400.00

250

 

 

10

15

Irrigation

HT

30

100.00

250

 

 

10

16

Allied Agro Activities

HT

30

110.00

250

 

 

10

17

Allied Agro Industrial Activities

HT

50

370.00

250

 

 

DPS/Rebate

18

Specified Public Purpose

HT

250

As indicated in the notes below.

250

 

 

DPS/Rebate

19

General Purpose >70 and < 110 KVA

HT

250

250

 

 

10

20

H.T .Industrial (M) Supply

HT

250

250

 

 

DPS/Rebate

21

General Purpose >= 110 KVA

HT

250

250

 

 

DPS/Rebate

22

Public Water Works & Swerage Pumping

HT

250

250

 

 

10

23

Large Industry

HT

250

250

 

 

DPS/Rebate

24

Power Intensive Industry

HT

250

250

 

 

DPS/Rebate

25

Ministeel Plant

HT

250

250

 

 

DPS/Rebate

26

Railway Traction

HT

250

250

 

 

DPS/Rebate

27

Emergency  Supply to CPP

HT

0

700.00

250

 

 

DPS/Rebate

27

Colony Consumption

HT

0

450.00

0

 

 

DPS/Rebate

 

EHT Category

29

General Purpose

EHT

250

As indicated in the notes below.

700

 

 

DPS/Rebate

30

Large Industry

EHT

250

700

 

 

DPS/Rebate

31

Railway Traction

EHT

250

700

 

 

DPS/Rebate

32

Heavy Industry

EHT

250

700

 

 

DPS/Rebate

33

Power Intensive Industry

EHT

250

700

 

 

DPS/Rebate

34

Ministeel Plant

EHT

250

700

 

 

DPS/Rebate

35

Emergency  Supply to CPP

EHT

0

690.00

700

 

 

DPS/Rebate

36

Colony Consumption

EHT

0

440.00

0

 

 

DPS/Rebate

 

Note:                           
                                                       Energy Charges for HT & EHT Consumers

Load Factor (%)

HT

EHT

up to 50%

495 p/u

490 p/u

>50% = <60%

450 p/u

445 p/u

>60%

395 p/u

390 p/u

                                                          For details, the orders of the Commission may be referred.

Note:

(i)The energy charge for consumption <=100 units per month in domestic category in LT has remained unchanged for FY 2010-11.

(ii) The tariffs for “irrigation pumping and agriculture” and allied agricultural activities have also remained unchanged for FY 2010-11.

(iii) The reconnection charges have remained unaltered.

(iv) The meter rent has been revised w.e.f. 01.04.2010 as follows:

Type Of Meter

Revised Meter Rent(Rs.)

1. Single phase electro magnetic Kwh meter

20

2. Three phase electro magnetic Kwh meter

40

3. Three phase electro magnetic trivector meter

1000

4. Trivector meter for Railway Traction

1000

5. Single phase Static Kwh meter

40

6. Three Phase Static Kwh meter 150

150

7. Three phase Static Trivector meter

1000

8. Three phase Static Bi vector meter

1000

9. LT Single phase AMR/AMI Compliant meter

50

10.LT Three phase AMR/AMI compliant meter

150

No meter rent shall be payable after the full cost of the meter is recovered.

(v) Prospective small consumers requiring new connection upto and including 3 KW load shall only pay a flat charge of Rs.1000/- as service connection charges towards new connection excluding security deposit as applicable as well as processing fee of Rs.25/-. The service connection charges includes the cost of material and supervision charges.
(vi) In case of installation with static meter/meter with provision of recording demand, the recorded demand rounded to nearest 0.5 KW shall be considered as the contract demand requiring no verification irrespective of the agreement. Therefore, for the purpose of calculation of Monthly Minimum Fixed Charge (MMFC) for the connected load below 110 KVA, the above shall form the basis.
(vii) The billing demand in respect of consumer with Contract Demand of less than 110 KVA having static meters should be the highest demand recorded in the meter during the Financial Year irrespective of the Connected Load, which shall require no verification.
(viii) Three phase consumers with static meters are allowed to avail TOD rebate excluding Public Lighting and emergency supply to CGP @10 paise/unit for energy consumed during off peak hours. Off peak hours has been defined as 12 Midnight to 6 AM of next day.
(ix) Drawl by the industries during off-peak hours upto 120% of Contract Demand without levy of any penalty has been allowed. “Off-peak hours” for the purpose of tariff is defined as from 12 Midnight to 6.00 A.M. of the next day. The consumers who draw beyond their contract demand during hours other than the off-peak hours shall not be eligible for this benefit. When Statutory Load Regulation is imposed then restricted demand shall be treated as contract demand.
(x) General purpose consumers with Contract Demand (CD) < 70 KVA shall be treated as LT consumers for tariff purposes irrespective of level of supply voltage. As per Regulation 76 (1) (c) of OERC Distribution (Condition of Supply) Code, 2004 the supply for load above 5 KW upto and including 70 KVA shall be in 2-phase, 3-wires or 3-phase, 3 or 4 wires at 400 volts between phases.
(xi) Power factor incentive for HT & EHT consumers will be applicable above power factor of 97% and power factor penalty shall be applicable below the level of 92% w.e.f. 01.04.2010.
(xii) Special Tariff for industries of contract demand 100 MVA and above and guaranteed monthly off-take of 80% shall pay a consolidated energy charge of 330 paise per unit.
(xiii) The printout of the record of the static meter relating to MD, PF, number and period of interruption shall be supplied to the consumer wherever possible with a payment of Rs.500/- by the consumer for monthly record.
(xiv) Tariff as approved shall be applicable in addition to other charges as approved in this Tariff order w.e.f. 01.04.2010.